|
|
|
|
|
|
|
|
|
|
|
|
|
The following additions & modifications to the original contents of this DCR are implemented: See attached spec mark-up Draft 7 for details. Para. 1.7.2.1, 1.7.2.2, 1.7.2.5: wording used is modified for clarification/consistency purposes Para. 1.9.3: last sub-para is amended to be consistent with the changes w.r.t heat-shrink tubing.
Plus several minor editorial changes in; Para. 1.4.2 Note 5:
|
|
|