• Our activities
  • Technologies
  • Other resources
 
 
 













5204002_Issue_4_-_Draft_A.pdf



Page 6: Re-instate Note 1, with the other Notes reverting to their
original numbers (e.g. Note 2 will remain Note 2 instead of becoming
Note 1 as shown in the attached mark-up);

Page 6, Note 2: add ", and any handling," between "testing" and
"performed".

Page 7: Note 5 will remain Note 5 (instead of becoming Note 4 as shown
in the attached mark-up).

Page 16, Paras. 2.9.1 and 2.9.2: There are to be no changes to the Power
Dissipation Test Conditions.






Changes

Menu

Are you sure you want to delete this menu item?

Optimized for:

© 2010 European Space Agency. All rights reserved.

About | Mission | Sitemap | Known Issues | Feedback | Disclaimer and copyright