Modifications
The original changes detailed in the Exxelia attachment to DCR1709 are replaced in full by the following details included in the Exxelia Appendix A as “Additional Data” (as agreed with Exxelia):

….
ADDITIONAL DATA - EXXELIA TECHNOLOGIES (F)
Exxelia Recommend Storage Conditions
The following recommendations apply:
1) The maximum storage period after delivery to the Customer, with the components maintained in Exxelia’s original hermetically sealed packaging, is 1 year.

2) Upon their removal from Exxelia’s packaging, the components may be stored for an additional period of up to 3 months over a temperature of +10°C to +30°C, at a relative humidity of up to 60%.

If either period specified in 1) and 2) above is exceeded, it is recommended that the components be subjected to one of the two following drying procedures prior to use:
o Drying Procedure 1:
Step 1: dry in a vacuum chamber at 10Pa ≤ P ≤ 100Pa at Tamb = +85°C for 48 hours.
Step 2: dry in a ventilated chamber at Tamb = +125°C for 48 hours.

o Drying Procedure 2:
Dry in a ventilated chamber at Tamb = +125°C for 144 hours

If the total storage period after delivery to the Customer exceeds 2 years, or if the components are subjected to an environment outside the storage conditions given in 2) above, drying as above followed by relifing in accordance with ECSS Q-ST-60-14 is recommended.







Changes

Menu

Are you sure you want to delete this menu item?

Optimized for:

© 2010 European Space Agency. All rights reserved.

About | Mission | Sitemap | Known Issues | Feedback | Disclaimer and copyright