Document Properties | |
---|---|
Feedback to: | Fernando Martinez |
Published: | 07-03-2016 |
Public Document |
ESCCON 2011 - 15th of March 2011
The presentations can be downloaded individually or as a group of morning and afternoon sessions.
09:00 – 09:15 |
![]() |
W. Veith. Head of Product Assurance and Safety Department, ESA | |
09:15 – 09:45 |
![]() |
G. Bernède, Head of Quality Assurance Division, EUMETSAT | |
09:45 – 10:15 |
![]() |
E. Lance, EUTELSAT | |
10:15 – 10:45 | |
R. Schmidt, Head of the Telecommunications Satellite Programmes Department, ESA | |
10:45 – 11:10 |
![]() |
D. Greves, Consultant, Barlow, Lyde & Gilbert LLP | |
11:30 – 12:00 |
![]() |
P. Goudy, Deputy Director CNES Toulouse Centre | |
12:00 – 12:30 |
![]() |
M. Le Moine, Chief Technology Officer, ASTRIUM | |
12:30 – 13:00 | The Prime’s vision: Future needs, trends and challenges for EEE components (payload) |
M. C. Comparini, Deputy CTO / VP R&D, Technology and Product Policy, | |
14:20 – 14:40 |
![]() |
R. Gilmore, EC (DG Enterprise and Industry, Space Research and Applications Unit) | |
14:40 – 15:00 |
![]() |
C. Erd, Advanced Studies and Technology Preparation Division, ESA ScienceProgramme | |
15:00 – 15:20 |
![]() |
B. Candaele, Deputy Director Hardware Engineering Competence Centre, Thales (for ASD, the AeroSpace and Defence Industries Association of Europe) | |
15:40 – 16:00 |
![]() |
T. Hult, Chief Engineer Digital Products, RUAG Space AB | |
16:00 – 16:20 |
![]() |
S. Airey, Control Systems Division, ESA (ESTEC) | |
16:20 – 16:40 |
![]() |
M. Melotte, Advance technology Coordinator, Thales Alenia Space ETCA | |
16:45 – 17:45 | Roundtable: Towards a sustainable supply of EEE parts for European Space Systems |